Carrying out engineering-geological investigations for the plant within the territory of Shamkir
District
A total of 31 boreholes were drilled, comprising 740 m of engineering-geological exploration works.
Within the scope of the investigations, 36 soil (rock) samples and 4 water samples were collected.
Additionally, 34 Standard Penetration Tests (SPT), 40 piezometric measurements, and 20 Dynamic
Penetration Tests (DPT) were performed.