Project Details

Home – Project Details

KALBAJAR RC-REVERSE CIRCULATION DRILLING

Project details:
  • Client Name: AzerGold CJSC
  • Location: Azerbaijan, Kalbajar (Zod)
  • Project duration: 2025 - 2026
  • RC Drilling: 3720 m
Project Overview:

Carrying out reverse circulation drilling operations in the Kalbajar (Zod) district.

In total, across 61 boreholes, the overall drilled depth was 3720 m, 269 core boxes were collected, and 4272 RC sample bags were prepared for laboratory analysis.