Project Details

Home – Project Details

GOYGOL RC-REVERSE CIRCULATION DRILLING

Project details:
  • Client Name: AzerGold CJSC
  • Location: Azerbaijan, Goygol (Tulallar)
  • Project duration: 2025 - 2025
  • RC Drilling: 4724 m
Project Overview:

Carrying out reverse circulation drilling operations in the Goygol district.

In total, across 86 boreholes, the overall drilled depth was 4,071.45 m, 279 core boxes were collected, and 4,724 RC sample bags were prepared for laboratory analysis.