+994 51 967 61 39
Home – Project Details
Carrying out reverse circulation drilling operations in the Goygol district.
In total, across 86 boreholes, the overall drilled depth was 4,071.45 m, 279 core boxes were collected, and 4,724 RC sample bags were prepared for laboratory analysis.