+994 51 967 61 39
Home – Project Details
Carrying out reverse circulation drilling works in the area of Chovdar Village.
In total, across 58 boreholes, the overall drilled depth was 4184 m, 65 core boxes were collected, and 2156 RC sample bags were prepared for laboratory analysis.