+994 51 967 61 39
Home – Project Details
Carrying out peacekeeping drilling works within the “Shusha–Lachin highway reconstruction” project.
Drilling of boreholes for blasting of rock-type formations- -902,700.20 m3 Drilling of bolt and barbacan (drainage) boreholes-6,886.00 m3