KHUDAFARIN–GUBADLI–LACHIN HIGHWAY

Project details:
  • Client Name: Polat Yol Yapı San. ve Tic. A.Ş.
  • Location: Azerbaijan, Lachin-Gubadli
  • Project duration: 2024 - 2026
  • Blasting Drilling: 1147807.08 m3
Project Overview:

Carrying out peacekeeping drilling works within the territories of the districts covered by the construction projects of the “Khudafarin–Gubadli–Lachin highway (km 00+000–66+000) and Khinalig–Gubadli section (km 00+000–17+000)” and the “new road branching off at km 33 of the Khudafarin–Gubadli–Lachin highway and extending to the Lachin corridor

Drilling of boreholes for blasting of rock-type formations- 1,145,713.08 m3 Drilling of bolt and barbacan (drainage) boreholes-2,094.00 m3