Client Name:Azerbaijan Internation Mining Company (AIMC)
Location:Azerbaijan, Gadabay
Project duration:2023 - 2023
Geotechnical:256.75 m
Project Overview:
Conducting engineering-geological monitoring works in the area of Soyudlu village,in the vicinity of
the cyanide pond.
A total of 5 boreholes were monitored, comprising 256.75 m of engineering-geological monitoring works.
Within the scope of the investigations, 29 soil (rock) samples were collected, and 51 Standard
Penetration Tests (SPT), 45 m of piezometer installations, and 151 m of vibropiezometer installations
were carried out.