Client Name:Azerbaijan Internation Mining Company (AIMC)
Location:Azerbaijan, Gadabay
Project duration:2023 - 2023
Geotechnical:200 m
Project Overview:
Conducting engineering-geological investigations within the territory of Gadabay District.
A total of 10 boreholes were drilled, comprising 200 m of engineering-geological works. Within the
scope of the investigations, 35 soil (rock) samples were collected, and 127 Standard Penetration Tests
(SPT) were performed.