Client Name:Azerbaijan Internation Mining Company (AIMC)
Location:Azerbaijan, Gadabay
Project duration:2023 - 2023
Geotechnical:35 m
Project Overview:
Conducting engineering-geological works in the area of Gilar Village.
A total of 2 boreholes were drilled, comprising 35 m of engineering-geological works. Within the scope
of the investigations, 4 soil (rock) samples were collected, and 20 Standard Penetration Tests (SPT)
were performed.