Conducting engineering-geological investigations within the territory of Dashkasan District
A total of 94 boreholes were drilled, comprising 1251.50 m of engineering-geological investigations.
During the studies, 275 soil (rock) samples were collected, and 391 Standard Penetration Tests (SPT), 12
water permeability tests, and 10 trial pits were carried out.